Limited Access Only. Log In Get Access
//knekt.tv/knekttv/video/knekttvarchive/64201/64204-season-1/133623-deer-horn-capital-csedhc-released-results-of-a-positive-ni-43-101-pea-on-its

KNEKT®tv

HomeKNEKT TV Archive 4Deer Horn Capital (CSE:DHC) released results of a positive NI 43-101 PEA on its

Deer Horn Capital (CSE:DHC) released results of a positive NI 43-101 PEA on its

Investment Pitch | Season 1

The project, a gold-silver-tellurium deposit in west-central British Columbia, is located 135 kilometres southwest of the community of Burns Lake and 36 kilometres south of the Huckleberry mine. The Preliminary Economic Assessment was calculated on only 450 metres of a 2.4 kilometre-long mineralized system, and emphasized that the deposit remains open to the west, east and down-dip.